Mianyang Special Education School Construction Progress
,
Wood Frame Work
7-8
7-8 - Students Dorm and Classroom Building Seen from West
 
7-8
7-8 Classroom Building Almost Complete
 
7-6
7-6 Tower is Ready for Uninstalling Scaffolding
 
7-5
7-5 Painting the Siding
 
7-4
7-4 Installing Facia on Classroom Building
 
7-2
7-2 Backside of Teachers Dorm
 
6-6
6-6 Administration Building seen Between two Towers
 
6-4
6-4 Admin Second Floor Hall Ceiling Completed
 
6-1
6-1 Starting the SBS Sheeting
 
6-1
6-1 Electricians Keeping Piping Parallel
 
5-22
5-22 Trusses Fabricated for Kitchen
 
5-18
5-18 Students Dorm
 
5-16
5-16 Teachers Dorm
 
5-16
5-16 Framing Cafeteria Walls
 
5-12
5-12 Nailing Treads and Risers
 
5-10
5-10 Forming Walls Against the Tower of the Classroom
 
5-10
5-10 Dorm Building Seen from the South
 
5-8
5-8 FII China Staff Working with Fire Foreman on Piping
 
4-6
4-6 Installing Classroom Ceiling
 
4-6
4-6 Installing Sheathing for South Classroom Trusses
 
4-5
4-5 Tapered Truss Tails
 
4-3
4-3 Truss Strapping Finished in Teachers Dorm
 
4-3
4-3 Framing North Classroom Hall Walls
 
4-2
4-2 North Classroom Interior Walls Going Up
 
4-1
4-1 North CLassroom framing Dorm Front View
 
4-1
4-1 First Gable Walls go up on the North Classroom
 
4-1
4-1 Installing Shear and OSB for Classrrom
 
3-30
3-30 South Classroom Framing
 
3-30
3-30 North Classroom Floor Work
 
2-24
2-24 Roof Sheathing Seen from Beneath
 
2-23
2-23 Hall Framing in the Student Dorm
 
2-1
2-1 Installing Exterior Sheathing on the Student Dorm
 
1-29
1-29 2X10 Accents on Truss Tails are added
 
1-28
1-28 Scaffolding is up on the Dorm
 
1-28
1-28 Double LVL in Rim Position Over the Exterior Walls
 
1-26
1-26 Trusses Ready for the Detail Tails to be Added
 
1-26
1-26 Scaffolding Starts up on the Wood Frame Structures
 
1-26
1-26 Only a Few Trusses left to Install on the Students Dorm
 
1-26
1-26 Gable end of the Student Dorm
 
1-26
1-26 Framing the Clearstory above the Teachers Dorm Hallway
 
1-21
1-21 Both Clearstory Vent Walls are Standing in Student Dorm
 
1-20
1-20 Student Dorm Clearstory Vent Wall Standing
 
1-19
1-19 Teachers Dorm Walls Taking Shape
 
1-19
1-19 Maually Sharpening Hand Saw During Power Shortage
 
1-18
1-18 Teachers Dorm Interior Walls being Framed
 
1-18
1-18 Students Dorm Hallway on Second Floor
 
1-18
1-18 OSB Floor Completed on Teachers Dorm and Sill Plates Marked
 
1-15
1-15 Student Dorm Walls Produced
 
1-15
1-15 Rolling the Joists to the Teachers Dorm
 
1-15
1-15 Students Dorm Hall Walls Finished
 
1-14
1-14 Wall Framing Starts on the Second Floor
 
1-14
1-14 East Dorm Plating is being Finished
 
1-13
1-13 Snapping Lines for Walls on the Second Floor
 
1-12
1-12 OSB Flooring
 
1-12
1-12 Framing in the Teachers Dorm
 
1-12
1-12 Piping Installation in the Joists
 
1-12
1-12 Backing for Edge Nailing put in the Dropped Floors
 
1-10
1-10 West Dorm Seen from Tower
 
1-10
1-10 West Dorm Framing
 
1-10
1-10 East Dorm Seen from Tower
 
1-10
1-10 East Dorm Framing
 
1-4
1-4 Dorm Seen from Property Line
 
1-4
1-4 Precut and Nailed Headers Ready for Second Floor Work
 
1-3
1-3 Pressing Process
 
1-3
1-3 Precut Truss Parts Stack-up
 
1-3
1-3 Interior Shear Finished
 
1-3
1-3 Corridor Wall Braced and Ready
 
1-1
1-1 Cutting OSB for Shear Walls
 
1-1
1-1 Top Plates On
 
1-1
1-1 First Truss is Made
 
12-30
12-30 Interior Framing Starting to Sow
 
12-28
12-28 Walls Coming Together
 
12-28
12-28 Exterior Walls Framed On-site
 
12-26
12-26 First Interior Wall Erected
 
12-26
12-26 First Wall Assembled on Site
 
12-26
12-26 Men Working on the Lumber
 
12-25
12-25 Shim Work set to a String Line
 
12-24
12-24 Sil Gasket on First
 
12-24
12-24 Plate Starts Down
 
Lumber Arrives on Site
1-27
1-27 Treated Materials Arrive
 
12-16
12-16 Foundation Work Progress as Lumber Arrives
 
12-16
12-16 Second Truck Load
 
12-16
12-16 Canfor Lumber
 
12-16
12-16 Dunkley Lumber
 
12-16
12-16 Tolko Lumber
 
12-15
12-15 Lumber Arrives on Site at 3:30AM
 
12-15
12-15 Second Truck Loaded with 2X10 Floor Joists and ACQ-treated Plate
 
12-15
12-15 Second Truck off Loaded
 
12-15
12-15 Unstrapping the Tie Downs for Unloading to Start
 
12-15
12-15 2X10 Stacks up Awaiting the Floor System Work to Come
 
Foundation Work - December 2009 Progress
12-10
12-10 First Piling to be Poured in Classroom Building
 
12-9
12-9 Storage Building Starting to go up in Lumberyard
 
12-8
12-8 Forms off the First Floor Walls of the Dorm Tower
 
12-7
12-7 Bucket of Mud Flying into Place over the Forms
 
12-6
12-6 Foundation Showing Through the Back Fill
 
12-5
12-5 Scaffolding is up Inside for a Walkway to Pour Mix
 
12-4
12-4 8M Down the Hole with Little Light
 
12-3
12-3 Forms Coming off the West Dorm
 
12-2
12-2 GC and Inspectors confirm on Quality and Conformity of the Work to the Plans
 
12-1
12-1 Forms Continue to be Installed